Monday, 29 June 2015

Hard Floor Assembly Mercury Inflatable Boat Assembly

STEP 1 : Unfold the deflated Mercury Boat
Clear a flat space (making sure it is clean and free of sharp objects) and unfold your Mercury boat. Remove the hull from its box and take it out of the boat bag. Unroll the hull so it laid out flat.

STEP 2 : Inflate slightly
Push and twist all valves one quarter to the closed position. The Mercury Inflatable Boats can be inflated either with a hand pump or with electric pump. The electric pump can inflate the boats to a moderate pressure and save a lot of time, but boat will need to be finished off with a hand pump. Inflate all hull chambers to approximately 30% full in order to make floorboard insertion easier.


Read entire article on http://goo.gl/qR8ccX




For more information Contact us at :
Navnit Marine Private Limited
Navnit House, Gokul Nagar,
 Mumbai Agra Road, 
Thane (W), 400601Mumbai, India
Tel: (+91) 22 6677 6659 
Service : (+91) 22 2723 1555 
Mobile : (+91) 9773377555
E-mail: info@navnitmarine.com 

1 comment:

  1. Thanks for sharing this post. I just buy a inflatable boat pump And the work very good.

    ReplyDelete